System Boundary, Dependencies and Baseline

Review questions

System Boundary, Dependencies and Baseline — Integrated Summary

Food-water resilience assessment starts by naming the people and period covered and tracing the paths from water source through grower, store, market and household. An administrative city boundary is insufficient when food enters from outside or local washing depends on water inside it. Each baseline measure needs a numerator, denominator, unit and subgroup; a household-order rate is not a vehicle-trip count. Dependency mapping shows how one pump failure can affect washing and storage together, without double-counting a consequence. Before selecting an intervention, examine missing records: an unlogged delivery is not necessarily a zero, and a dispatched box is not a household receipt. Participants help set the mandate and challenge disputed facts while the record names decision authority and absent voices. The transferable output is a boundary map, reproducible indicator table and evidence-gap register. Fictional figures support practice, not claims about a real city.

Review questions

Test your understanding with these questions. Marking and saved results are available with a free account.

  1. Question 1Ready boxes enter the town market from outside while local washing stops. Should the outside supplier be excluded from the boundary map?
  2. Question 2A market has one hundred sales and a committee records eighty served households in a week. Is 100/80 household coverage?
  3. Question 3A washing pump fails, but the market has two days of usable stock. Does the fault establish late household service today?
  4. Question 4Ten distribution records have no final status. Should all ten be coded as zero receipts?
  5. Question 5One neighborhood delegate attends a meeting while evening-shift workers are absent. Does attendance establish consent of the whole area?
  6. Question 6Pumping resumes before the reserve tank empties while the truck road remains closed. Does washing still stop under the original scenario?
  7. Question 7Thirty vehicles use an exposed road and an area has fifty households. Is 30/50 the household exposure rate?
  8. Question 8Two renting households differ: one has two days of safe storage, the other none. Should tenure alone give them the same vulnerability rating?
  9. Question 9Impact is four and likelihood three on ordinal scales. Is their product twelve a measured monetary expected loss?
  10. Question 10A delivery-delay indicator crosses a local warning threshold for one day while a logging fault is known. Should a long contract begin immediately?
  11. Question 11Does listing an untested backup supplier establish current operational capacity?
  12. Question 12An adaptation raises crop output but draws additional water from nearby household service. Is its food gain sufficient to declare it best?
  13. Question 13Citywide average access improves after moving a pickup point while a remote area's travel time rises. Is the overall average enough to expand?
  14. Question 14An option leads by one point under disputed criterion weights. Is its rank final?
  15. Question 15An emergency well may preserve food for a week but reduce later household water reserves. What stop question matters?
  16. Question 16A technician confirms the fault, but finance must sign the supplier contract. Can the technician sign because they verified first?
  17. Question 17Funds cover reserve stock purchase but not cooling or delivery. Is the option fully funded?
  18. Question 18Two suppliers use the same only crossing. Are their capacities independent during its closure?
  19. Question 19A documented travel-time complaint arrives before a store site is fixed. Is a complaint number without an outcome an adequate response?
  20. Question 20A road test ends on day five and a seven-day sequential site approval follows. Is the site ready on day five?
  21. Question 21A box arrives on time but is spoiled. Does it count in timely usable receipt?
  22. Question 22Recipients rise from eighty to one hundred while eligible requests rise from one hundred to 140. Has the receipt rate improved?
  23. Question 23A response meeting starts in ten minutes, but the first household receipt takes three hours. Which time measures service restoration?
  24. Question 24The overall rate passes but the outer-area gap fails the written equity gate. Expand the portfolio unchanged?
  25. Question 25Option A projects 120 of 150 receipts, but its shared vehicle is untested during outage. Should the brief report 120 as observed?